Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 24 results ...

Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects, Unpublished PhD Thesis, Bristol Enterprise, Research and Innovation Centre , University of the West of England, Bristol.

  • Type: Thesis
  • Keywords: collaboration; design process; documentation; environmental impact; focus group; landfill; materials; offsite; prefabrication; procurement; project team; reuse
  • ISBN/ISSN:
  • URL: https://uwe-repository.worktribe.com/output/897604
  • Abstract:
    The construction industry contributes the largest portion of waste to landfill, and it consumes a significant proportion of mineral resources excavated from nature. Due to adverse environmental impacts of waste generation, as well as financial gains associated with its minimization, waste intensiveness of the industry has remained a major concern across nations. This study investigates the design, procurement and construction strategies for waste minimization, using a dynamic approach. Apart from an investigation of the key and underlying measures for construction waste mitigation, the study considers the interrelationship between stages of projects' lifecycle. This is as activities carried out at an earlier stage are capable of engendering occurrences at later stages of the dynamic project delivery processes. Following the tenets of critical realism philosophy and exploratory sequential mixed method, the study combined qualitative and quantitative approaches at intensive and extensive stages respectively. At the early stage of the study, data were collected through literature review and focus group discussions with industry experts. Results of the qualitative study were used to develop a questionnaire, which was analysed using statistical approach and structural equation modelling. As a means of investigating the key drivers of waste minimization at a holistic level, a system dynamic model was developed to simulate the interplay and effects of different strategies that were confirmed through the previous process. The study suggests that design stage has the most decisive impacts on construction waste minimization. At this stage, the key dimensions for designing out waste include design for modern methods of construction, collaborative design process, design for standardisation and waste-efficient design documentation. Error-free design and involvement of contractors at early design stage are part of the critical success factors for designing out waste. With design being much important for waste minimization, competencies of design in terms of waste behavioural competency, design task proficiency, construction-related knowledge and inter-professional collaborative competency are essential for designing out waste. Materials procurement process could enhance waste minimization by considering its key dimensions for driving waste-efficient projects, which includes waste-efficient materials purchase management, suppliers' alliance and waste-efficient bill of quantity. Efficient materials take-off and take back scheme are confirmed as critical success factors for driving waste minimization through materials procurement processes. During construction activities, waste could be reduced through prefabrication and offsite technology, contractual requirements, maximisation of materials reuse and improved collaboration, among others. Prefabrication, supply chain alliance and collaborative procurement routes are confirmed as the critical success factors for reducing waste during construction process. Dynamic interplay among these sets of strategies suggests that notwithstanding the significance of the different measures during design, procurement and construction processes, prefabrication technology and collaborative procurement route are the holistic drivers of construction waste minimisation. The study implies that designers could effectively drive waste minimization through dimensional coordination and standardisation of design in line with standard materials supplies. In addition to the need for prefabrication and offsite technologies, increasing collaboration among project team is requisite to reducing waste generated by construction activities. By implementing the strategies suggested in the study, substantial proportion of construction waste would be diverted from landfill.

Akinade, O O (2017) BIM-based software for construction waste analytics using artificial intelligence hybrid models, Unpublished PhD Thesis, Department of Business and Management , University of the West of England, Bristol.

Alaka, H A (2017) 'Big data analytics' for construction firms insolvency prediction models, Unpublished PhD Thesis, Faculty of Business and Law , University of the West of England, Bristol.

Asah-Kissiedu, M (2019) Development of an integrated safety, health and environmental management capability maturity model for Ghanaian construction companies, Unpublished PhD Thesis, Department of Architecture and Built Environment , University of the West of England, Bristol.

Baba, A (2013) Developing a decision support framework for low carbon housing design and delivery in the UK, Unpublished PhD Thesis, Department of Architecture and Built Environment , University of the West of England, Bristol.

Balogun, T B (2018) Integrating bridge maintenance life cycle assessments into bridge design for improved sustainable decision making, Unpublished PhD Thesis, Department of Architecture and Built Environment, University of the West of England, Bristol.

Chidiobi, C (2022) Development of frameworks for the management of materials procurement and construction waste for Nigerian contractors, Unpublished PhD Thesis, , University of the West of England, Bristol.

Clark, P I (2011) CDM regulations: safety targeted assessment through gateway evaluation (stage) approach, Unpublished PhD Thesis, , University of the West of England, Bristol.

Dwairi, S (2018) Development of an Ontology-based framework and tool for Employer Information Requirements (OntEIR), Unpublished PhD Thesis, Department of Architecture and Built Environment , University of the West of England, Bristol.

Evans, M (2013) An investigation into occupants' satisfaction in UK sustainable social housing, Unpublished PhD Thesis, Faculty of Environment and Technology , University of the West of England, Bristol.

Henjewele, C (2010) Modelling client's value for money uncertainties in PFI projects, Unpublished PhD Thesis, Faculty of Environment and Technology , University of the West of England, Bristol.

Lam, T (2017) A web-based Decision Support System to assist SMEs to broker risks and rewards for BIM adoption, Unpublished PhD Thesis, Faculty of Environment and Technology , University of the West of England, Bristol.

Love, N E (2009) Leading indicators of failure: a study of SMES in the construction sector in Wales and Scotland, Unpublished PhD Thesis, Business School , University of the West of England, Bristol.

Mahamadu, A-M (2017) Development of a decision support framework to aid selection of construction supply chain organisations for BIM-enabled projects, Unpublished PhD Thesis, Department of Architecture and Built Environment , University of the West of England, Bristol.

Meng, X (2008) Development of assessment framework for construction supply chain relationships, Unpublished PhD Thesis, School of the Built and Natural Environment , University of the West of England, Bristol.

Muhammed-Yakubu, N (2023) A BIM-based information management schema for construction activities data-flow across the project life cycle, Unpublished PhD Thesis, , University of the West of England, Bristol.

Oladejo, J (2020) An investigation in the factors affecting the implementation of health and safety management practices by contractors in Nigeria, Unpublished PhD Thesis, Department of Architecture and Built Environment , University of the West of England, Bristol.

Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities, Unpublished PhD Thesis, , University of the West of England, Bristol.

Owolabi, H (2018) Public accountability: The case of government guarantee scheme in PFI/PPP projects, Unpublished PhD Thesis, Department of Architecture and Built Environment, University of the West of England, Bristol.

Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector, Unpublished PhD Thesis, , University of the West of England, Bristol.

Rogan, D J (2003) Attitudes towards innovation in the construction industry: The case in the social housing sector, Unpublished PhD Thesis, , University of the West of England, Bristol.

Smith, D (2020) Rank and file union organising and employers' counter-mobilisation: The role of activists in the mobilisation of 'self-employed' construction workers, Unpublished PhD Thesis, Department of Architecture and Built Environment, University of the West of England, Bristol.

Tanabe, S (2022) A risk allocation framework for public private partnerships (PPP) water infrastructure projects in Sri Lanka, Unpublished PhD Thesis, , University of the West of England, Bristol.

Yakubu, O A (2010) Cost and time control practice of construction projects in the UK: The pursuit of effective management control, Unpublished PhD Thesis, Department of Architecture and Built Environment, University of the West of England, Bristol.